ESA Report Abstract - Electrical Safety in the Workplace and Arc Flash
Revision 5.0
The mitigation and risk reduction options listed should be
reviewed and implemented based on a prioritized approach using the
following hierarchy:
- Eliminate the hazard, de-energize is the first choice
- Substitute with other materials, processes or equipment
- Reduce the risk by design (e.g. engineering solutions, equipment solutions, "Safety by Design")
- Implement appropriate Electrical Equipment Maintenance and at an acceptable frequency
- Use safer work systems that increase awareness of potential hazards (e.g. apply safeguards like signage, barriers, etc.)
- Implement administrative controls (e.g. training and procedures)
- Use Electrical Specific Personal Protective Equipment (PPE), Tools & Equipment, as a last line of defense, and ensure it is appropriately used and maintained.